PUBLIC DEMORead-only • Browse without login

Dashboard Toolbar

Project Health

Executive overview of readiness, risk, and delivery status

Pilot Project Context

This dashboard represents the WW Pilot - Stage 1 Expansion project for City Water Authority.

View Pilot Dataset →

Project health executive metrics and charts

Systems ready for handover

12

Binder-ready systems

Asset completeness

87%

Required documentation coverage

Submittals pending

23

Awaiting review or resubmission

Open deviations

8

Active non-conformances

Commissioning complete

72%

Program-wide progress

Inspection pass rate

94%

Recent inspection outcomes

Asset completion trend

Program completion percentage by month (demo pilot data)

Tracked assets

Completion volume (filtered view)

Completed

1085

Total

1247

Commissioning progress by system

Readiness by major system (percent complete)

Documentation completeness

Asset count with complete records per category

Handover binder status

Distribution across readiness states

Submittal pipeline

Volume by submittal status

Open deviations by severity

Issue concentration (non-conformance register)

Open risks by severity

Active risk register concentration

Inspection pass rate trend

Weekly pass rate trajectory (demo data)

Open risks register

Active risks from the pilot register (same data as charts above).

Open Risks

IDDescriptionSeverityStatus
RISK-001Delayed delivery of critical pump components for P-101HighOpen
RISK-002Incomplete as-built drawings for Electrical Distribution system (CP-401)MediumOpen
RISK-003Pending approval for Chemical Feed system modifications (CFP-205)MediumOpen
RISK-004Missing test certificates for Filtration system (FV-301)LowOpen

Demo Mode: This is a read-only demonstration. All data shown is static demo data.