PUBLIC DEMORead-only • Browse without login

Dashboard Toolbar

Verification / Inspection Records

Browse QA/QC verification and inspection records with findings, status, and responsible parties

Total Records
24
Open Findings
8
Passed / Accepted
14
Linked Deviations
4
6 records
RecordTitleTypeDisciplineFacility / SystemAssetStatusFindingDateDueResponsible
VR-ME-001
VR-001
P-101 Pump Alignment Verification
VerificationMechanical
Main Treatment Plant
Pumping Systems
P-101PassedAlignment within 0.05 mm tolerance3/10/20263/15/2026Commissioning Team A
VR-EL-002
VR-002
CP-401 Ground Fault Protection Inspection
InspectionElectrical
Main Treatment Plant
Electrical Distribution
CP-401OpenGround fault protection verification pending3/16/20263/30/2026Electrical QA/QC
VR-INST-003
VR-003
FT-501 Calibration Verification
VerificationInstrumentation
Main Treatment Plant
Instrumentation & Control
FT-501In ProgressAwaiting calibration certificate from vendor2/28/20263/15/2026Instrumentation QA/QC
VR-ME-004
VR-004
CFP-205 Pressure Test Inspection
InspectionMechanical
Main Treatment Plant
Chemical Feed
CFP-205Accepted with CommentsPressure test complete; witness signatures pending2/20/20263/5/2026QA/QC Team B
VR-ME-005
VR-005
FV-301 Material Certification Verification
VerificationMechanical
Main Treatment Plant
Filtration
FV-301OpenMaterial certification for vessel shell pending3/19/20264/2/2026QA/QC Team C
VR-HVAC-006
VR-006
AHU-601 Fire Rating Inspection
InspectionHVAC
Main Treatment Plant
HVAC
AHU-601FailedFire rating details missing on layout drawing3/5/20263/25/2026HVAC QA/QC