PUBLIC DEMORead-only • Browse without login

Dashboard Toolbar

Turnover & Handover Workflow

Dedicated surface for tracking system-level turnover packages and handover stages

Turnover Packages
3
Ready for Handover
1
Blocked
2
Awaiting Approval
2
Package / SystemFacilityStageReady (Doc / QC / Comm)Blocker SummaryOwner
Pumping System - Main Plant
HWP-001
Main Treatment PlantTechnical Acceptance
Doc: 95%QC: 100%Comm: 100%
NoneProject Lead
Chemical Feed Unit 1
HWP-002
Chemical Storage FacilityIn Review
Doc: 72%QC: 85%Comm: 60%
Pending NCR-003 closureQA/QC Mgr
Electrical Block PS-A
HWP-003
Pumping Station ADraft
Doc: 45%QC: 20%Comm: 0%
Missing as-built drawingsElectrical Lead