PUBLIC DEMORead-only • Browse without login

Dashboard Toolbar

QA/QC Dashboard

Overview of quality assurance and quality control metrics

Total Inspections

456 Inspections

Total Inspections

Open NCRs

18 NCRs

Open NCRs

Pass Rate

92 %

Pass Rate

Avg Closure Days

8 Days

Avg Closure Days

Inspection Pass/Fail Trend

91%
Current Pass Rate (478 Pass / 48 Fail)

Deviation Severity

18
Total Deviations

Open Inspections by System

Total Open
18
Highest
5
Pumping Systems
Pumping Systems
5
5
Electrical Distribution
4
4
Chemical Feed
3
3
Filtration
3
3
Instrumentation & Control
2
2
HVAC
1
1

Deviation Closure Time

18
Total Deviations
0-3 days
8 (44%)
8
4-7 days
6 (33%)
6
8-14 days
3 (17%)
3
15+ days
1 (6%)
1

Inspection / NCR Register

IDDescriptionSystemSeverityAssigned ToStatusDate
NCR-001Weld inspection failed on pump P-101 discharge line - Main Treatment PlantPumping SystemsHighQA/QC Team AOpen2026-03-15
NCR-002Electrical panel CP-401 missing ground fault protection verificationElectrical DistributionHighElectrical QA/QCIn Progress2026-03-16
NCR-003Chemical feed pump CFP-205 pressure test incompleteChemical FeedMediumQA/QC Team BOpen2026-03-18
NCR-004Filter vessel FV-301 missing material certificationFiltrationMediumQA/QC Team COpen2026-03-19

Deviation Register

Browse deviations with severity, disposition, and vendor tracking

View →

Verification / Inspection Records

Browse verification and inspection records with findings and status

View Records →