Export Packs & Handover Binders
Browse export packages and handover binder contents by system. Download and generation are disabled in the public demo.
Manage the end-to-end turnover lifecycle and package staging.
View Turnover Workflow →Total Export Packs
12
Handover Binders
8
System-Ready Packs
6
Documents Included
1247
5 packs
| Pack Name | Type | Facility / System | Readiness | Documents | Updated |
|---|---|---|---|---|---|
Pumping Systems — Handover Binder EP-001 | Handover Binder | Main Treatment Plant Pumping Systems | 92% | 48 docs / 52 files | 3/14/2026 |
Electrical Distribution — Handover Binder EP-002 | Handover Binder | Main Treatment Plant Electrical Distribution | 87% | 36 docs / 41 files | 3/13/2026 |
Filtration — Handover Binder EP-003 | Handover Binder | Main Treatment Plant Filtration | 78% | 28 docs / 30 files | 3/12/2026 |
Chemical Feed — System Pack EP-004 | System Pack | Main Treatment Plant Chemical Feed | 95% | 22 docs / 24 files | 3/14/2026 |
Instrumentation & Control — Handover Binder EP-005 | Handover Binder | Main Treatment Plant Instrumentation & Control | 82% | 34 docs / 38 files | 3/11/2026 |
Sample Handover Binder — Pumping Systems — Handover Binder
Main Treatment Plant · Pumping Systems
As-Built Drawings
12 docs · 100% complete- •P-101 General Arrangement
- •P-102 P&ID
- •Piping Layout Section A
- •Electrical Single Line Diagram
Operation Manuals
8 docs · 100% complete- •P-101 O&M Manual
- •P-102 O&M Manual
- •CP-401 Control Panel Manual
Test Certificates
6 docs · 83% complete- •P-101 Factory Test
- •P-102 Factory Test
- •Calibration Certificate FT-101
Commissioning Records
10 docs · 90% complete- •P-101 Pre-Commissioning Run
- •P-102 Pre-Commissioning Run
- •Pump Alignment Records
Warranty & Spares
4 docs · 75% complete- •Warranty Summary
- •Spare Parts List